Roadwork begins at 4th and LeClaire

Posted 7/1/25

Eldridge drivers who noticed road closures on 4th Ave. and LeClaire Road this week can expect those to continue throughout the summer, as the town works to install traffic lights and fix cracked pavement.

This item is available in full to subscribers.

Please log in to continue

E-mail
Password

Log in